From:                              route@monster.com

Sent:                               Thursday, September 24, 2015 12:58 PM

To:                                   hg@apeironinc.com

Subject:                          Please review this candidate for: Construction

 

This resume has been forwarded to you at the request of Monster User xapeix03

David Howell 

Last updated:  03/28/13

Job Title:  no specified

Company:  no specified

Rating:  Not Rated

Screening score:  no specified

Status:  Resume Received


Magna, UT  84044
US

Quick View Links:

Resume Section

Summary Section

 

 

RESUME

  

Resume Headline: David Howell - Construction Supervisor

Resume Value: hq3ppbw9ac49mby4   

  

 

David L Howell
7791 Glenwood Avenue Magna, Utah 84044
(801)-244-2537 howell0508@msn.com
Electronic Portfolio: http://davidlhowell.weebly.com
QUALIFICATIONS
• Lead or supervisory position for 29 years, with 32 total years of construction experience
• Able to formulate project schedules that create a proper flow of work and completion in proper sequence
• Strong abilities to review plans and recognize conflicts with the design
• Well developed communication and assessment skills
• Ability to work independently or as a part of a team
• Experienced in many types of construction technologies
• 10 hour and 30 Hour OSHA Trained, SWPPP Trained 2009, .
• Construction Management for Contractors by the U.S. Army Corps of Engineers June 1994
• Successfully completed many Remodels on projects that required existing operation to continue without construction
impact
• Proficient in layout using a Trimble Robotic Total Station ,LM-80 layout software and Auto Cad drawing software
FIELD EXPERIENCE
Comtrol Inc.
Project Supervisor
Salt Lake City, Utah
2007-Present, 1992-2001
• Construction of a $5.5 million 40,885 sq. ft., 3 Story 72 unit residences with 10,900 sq. ft. of office and common use area
for the Salt Lake City Housing Authority at the Veterans Hospital Campus Salt Lake City, Utah
• Remodel $3.5 Million Veterans Hospital Campus Salt lake City, Utah Building 2, 2nd Floor remodel and Mechanical
upgrade
• Construction of a $23 Million Public Services Maintenance Facility for Salt Lake City Corporation.
• Construction of the $16 million East Lake Elementary School in the Daybreak subdivision for the Jordon School District.
• Construction of a new $17.4 million Junior High School for the Granite School District in Magna, Utah.
• Construction of a new office building Old Mill $3.2 million
• Project supervisor for the construction of four phase projects at the Davis County School District Administration Office
Complex totaling $5.5 million.
• Construction of the $15.2 million remodel of the main building for the Veterans Administration Hospital.
• Combined package at the Air Route Traffic Control Center (A.R.T.C.C.), Salt Lake City, Utah $13.5 million included the
building of a new power service building, which was a heavy steel open storage building.
Camco Construction Inc.
Project Supervisor
Salt Lake City, Utah
2006 –2007
• Mill Rock Park Office Salt Lake City, Utah Phase IV parking garage addition and new 5 story office Class A office.
Jacobsen Construction Inc.
Project Supervisor
Salt Lake City, Utah
2005 –2006
• Started the Ensign Plaza project in Ogden, Utah a 4 story office building with a parking garage in the basement.
• Started the Silver Strike Condominium Project in Deer Valley while the project team could be tasked to the project.
• Remodel of a portion of the existing Wasatch Canyons facility to house the Behavioral unit from Primary Children’s
Hospital.
• Build foundation for a pre-built building, housing a state of the art T-3 MRI.
• Tenant build-out in a shell space at Primary Children’s Hospital. Offices for the doctors and patient account services.
BIRD Construction (USA) Inc.
Project Supervisor
Salt Lake City, Utah
2001- 2005
• Construction of a new Border Crossing Station for the Department of Homeland Security. The project is a two phase $15
million, three story building with 60,000 sq. ft., with state of the art technology and will house various agencies at the
International Bridge in Sault Sainte Marie, Michigan.
• Complete remodel of the Cottonwood Mall Meier & Frank Department Store in Salt Lake City, Utah. The $6.3 million
remodel project was done in 7 phases and included the demolition of all finishes back to the building structure, installation
of a new electrical back bone, new HVAC system and completely new interior shell.
SOFTWARE
Microsoft Excel
Primavera P3
Microsoft Word
Microsoft Office Outlook
AutoDesk AutoCAD
Sure Track



Experience

BACK TO TOP

 

Job Title

Company

Experience

Construction Supervisor

Comtrol,Inc

- Present

 

Additional Info

BACK TO TOP

 

Current Career Level:

Manager (Manager/Supervisor of Staff)

Work Status:

US - I am authorized to work in this country for any employer.

 

 

Target Job:

Target Job Title:

Construction Supervisor

 

Target Company:

Company Size:

 

Target Locations:

Selected Locations:

US-UT-Salt Lake City